Our Projects

Providing Quotes for Commercial & Industrial

Our Work

Project types:

  • Healthcare
  • Pharmaceutical
  • Medical Office Buildings
  • Institutions/Schools/Dormitories
  • Government
  • Office
  • Core/Shell
  • Warehouses/Distribution Facilities
  • Multi-Residential
  • Hotels
  • Assisted Living Facilities
  • Cultivation Facility
  • Fitness Centers
  • Industrial

Signature Healthcare Behavioral Health Facility

Shields Surgery Center Natick

Schneider Electric

Sanofi Genzyme 2GCz

Revere Springhill Suites

Pavillion at Riverwalk

Lifoam

I had the opportunity to work with Joe Anderson and Bill Gath of Sagamore Plumbing and Heating, Inc. on a large manufacturing facility build project in 2018 and 2019. This project did not have the benefit of having formal detailed construction drawings, but rather we worked from informal sketches, calculations and specifications. Being the first modern facility for Expanded Polystyrene, Polyurethane and associated components manufacturing, many decisions had to be made during the course of the project. Despite extraordinary obstacles and challenges associated with the project, Joe and Bill maintained a professional and capable demeanor throughout the project. The project was divided between these two leaders (Joe and Bill), who completed all the mechanical work for the job to include: three boiler steam system, pneumatic supply, fully automated dual closed-loop, two-stage cooling, gel water supply and treatment, and polyurethane multi-station delivery network.

The project demanded close coordination and collaboration between Bill and Joe, as well as, with Sagamore management, J Calnan and Associates (general contractor), and Lifoam (plant operator). These two project leaders did a most excellent job of working with their teams, managing their respective projects and communicating with me to understand the work at hand, as well as comprehending the bigger picture for the overall project. In the end, our modifications were minor, debug went smoothly and LifeMade now operates the most modern, state-of-the-art expanded polystyrene manufacturing facility in the US.

I owe many thanks to both Joe and Bill for their capable support, the working relationship we forged through the project, combined with the knowledge and professionalism they bring to the table. I would welcome the opportunity to work with either one or both again anytime, anywhere.

Regards,
W. Chris Mercy
Director of Engineering and Planning

Lifetime Athletic

It is my great pleasure to write this recommendation on behalf of Sagamore Plumbing & Heating as well as Jeff Coulstring and his field team whom completed the Life Time Fitness project at University Station in Westwood, Massachusetts. I have had the pleasure of viewing Jeff and his team’s professional development over the past 13 months, and I can state with confidence that they are a motivated and confident group with a high degree of integrity.

As Site Superintendent of the Life Time Fitness project, I feel I know Jeff and his team quite well. Jeff began the Life Time project back in June of 2014 as our site plumbing foreman and concluded our project with Sagamore in July of 2015 as our plumbing and HVAC foreman. In Jeff’s role, he had a considerable amount of responsibility and handled his position gracefully. As we all know, the construction industry can become contentious and hostile at times and Jeff and his team were artistic with their work and performed above expectations on this project from start to finish. Due to Jeff and his team’s dedication and attention to detail, Life Time Construction was able to accelerate our schedule and open our facility early allowing Life Time Fitness to begin generating revenue 30 days earlier than originally expected and in the Health & Fitness industry that can prove to be a very lucrative for a company.

During the contract process with Sagamore Plumbing & Heating, Sagamore project management endorsed Jeff to foreman the plumbing and heating scope for the Life Time project and he proved them right as he become an important, effective, and integral part of our project. Jeff and his team took the initiative to identify problems and devise solutions. Jeff’s role required strong communication skills, and he has shown that he not only has these skills, but that he also has the ability to inspire respect and cooperation in teammates. Jeff has shown that he is a very intelligent person with a mind well-suited to the world of construction, particularly plumbing and plumbing code knowledge.

Based on my observations, Jeff and his field team clearly have the interest to excel in this field, and based on their performance, they clearly have the ability to achieve success. I, therefore, would highly recommend Jeff Coulstring and the entire Sagamore team to not only work on another Life Time Fitness project but would put Jeff and his team up against just about any other mechanical contractor without reservation. If you need any further information about Jeff, his team or Sagamore Plumbing & Heating please do not hesitate to contact me.

Best Regards,
Daniel Ibrahim

Superintendent
Life Time Construction

Hilton Garden Inn

Ermont Cultivation

Emergent BioSolutions Process Chilled Water Upgrades

I want to thank you for your team’s commitment on the Emergent Process Chilled Water Upgrade Project in Canton, Ma. As you are aware this was a fast-paced, short scheduled project. Your team stepped up to the challenge and turned over a great product. The client was very pleased with the results.

Your foreman Brian Forget was instrumental in coordinating all the necessary shutdowns to meet our two-month deadline. He was very knowledgeable and was a great resource for the project team.

Team Sagamore did a professional job and I would highly recommend Sagamore Plumbing for future work.

Sincerely,

Brenden Gilmore
Senior Project Manager

Clippership Wharf

Assembly Row Block 5B

Amazon OWD5 & OWD9 Northborough

I’m pleased to provide this letter commending Sagamore Plumbing & Heating on your efforts to date on the Amazon OWD5 & OWD9 projects in Northborough, MA. This project entails installation of plumbing & HVAC systems throughout two 300,000 SF distribution centers.

This is a phased project with an extremely fast paced schedule, and your entire team have been up to the task of meeting project dates and deadlines. Your company’s ability to adapt to changing conditions, and unforeseen issues has allowed us to keep pace, and meet the owner’s expectations. I would specifically like to thank your site foreman Tim Roxborough for his leadership and efforts in helping with the water pressure issues we have been dealing with in both buildings.

Your team’s efforts to keep the buildings up and running for the owner while still meeting the daily project demands have been admirable. I feel strongly with the continued effort your team has shown to date that this project will be completed on schedule with great success for all. I would also like to commended Sagamore for their commitment to the safety protocols in place to maintain the buildings operations during this pandemic all while meeting the demands of the aggressive schedule.

Sincerely, Scott Rudolph

Construction Manager
Krusinski Construction Company

Amazon DBC6 Hingham

Dear Mr. Harold,
I want to take a moment to thank you for your team’s commitment and excellence on the Amazon DBC6 Warehouse in Hingham. I appreciate the outstanding service your team is providing on this project and wanted to let you know I am truly grateful.

The outstanding service begins with your foreman Christian Doucette who pays attention to detail on all aspects of the project. His ability to communicate, layout, and work multiple areas as needed to meet schedule is evident. The project kicked off with a slow start based on the tough trenching and ledge. His ability to think out of the box and mobilize in multiple areas, coordinating install on the
plumbing from top to bottom, making the final connections to the underground last, is impressive. This has allowed Level Construction to maintain schedule.

I also applaud your office support team on their quick submittal process, enabling procurement of equipment on this fast-paced project. Level Construction appreciates the effort Sagamore Plumbing & Heating has shown and look forward to completing this project on schedule.

I thank you, and your team, and look forward to future projects together.

Thanks again.
Sincerely, Jeff Huth

Senior Superintendent
Level Construction

Tufts University

Sagamore was responsible for all plumbing and HVAC construction for this research facility, which included critical sealed systems and redundant back-up measures.

Cape Cod Hospital

For a major renovation and campus expansion, Sagamore was tasked with all HVAC and plumbing design/build construction, as well as post-turnover maintenance.

This serves as a letter of recommendation for Sagamore Plumbing & Heating, Inc. and the services they have provided to Cape Cod Healthcare since 1995. Sagamore has successfully completed numerous HVAC, Plumbing and Medical Gas projects on the Hyannis and Falmouth campuses with professionalism, skill and eye to costs. Every employee from Sagamore shows care and takes proactive measures when working in and around our building. Our facilities personnel enjoy the working relationship as well as the knowledge and skillset the Sagamore team displays, whether it is working on a new tower or modifying a patient or administration area.

Sagamore is considered our mechanical contractor of choice and they have earned this reputation through the years.

Sincerely, William Hafferty
Director of Engineering

University of Massachusetts

A new science building required advanced laboratory gas piping, fume ventilation and securely plumbed safety stations.

Magazine Mockup Template

HOW SICK BUILDING SYNDROME
AFFECTS HOSPITALS, HEALTHCARE
& COMMERCIAL FACILITIES.

What can hospital administrators, healthcare decision makers, and commercial facilities managers do in response to sick building syndrome? Download this whitepaper to find out!

Download the Free Whitepaper

  • This field is for validation purposes and should be left unchanged.

Pin It on Pinterest

Compliance Settings
Increase Font Size
Grayscale
Simplified Font
Underline Links
Highlight Links
Reset
Close